Electric Vehicle Supply Equipment

China 180KW DC Fast Charging Station Manufacturer

As a China-based manufacturer, I bring you a reliable 180KW DC Fast Charging Station designed for fleet operators and charging network providers. This unit supports ultra-fast charging with CCS/CHAdeMO options, hot-swappable modules, and remote diagnostics. Built to withstand harsh environments, it features IP54 weather resistance, wide temperature operation, and integrated safety protections. The compact footprint helps install in urban sites and parking lots. With our service, you get OEM/ODM customization to integrate payment systems, fleet management software, and branding. I emphasize energy efficiency, using regenerative braking support and intelligent load balancing to optimize grid impact. Installation is simplified with plug-and-play connectors and remote monitoring via cloud platform. Price competitive for China market and exports to global markets; we can support pilots and large scale deployments. If you're looking to expand your charging network, contact me for a tailored solution, reliable after-sales service, and fast lead times.

Hot Selling Product

180KW DC Fast Charging Station Guarantees Peak Performance Outperforms the Competition

Designed for high-traffic sites—from highways to fleets—the 180KW DC fast charging station delivers peak charging performance with reliability that keeps assets productive. Its modular, scalable architecture supports rapid deployments and future capacity upgrades, ensuring low total cost of ownership for global buyers. Powered by intelligent power management, it minimizes energy waste while maximizing uptime. The station supports leading standards, including CCS, CHAdeMO, and GB/T, enabling universal compatibility for most electric vehicles. With robust cooling and fast fault isolation, it maintains stable output even in demanding climates. It features remote diagnostics, predictive maintenance, and a service-friendly design that reduces downtime and operating expenses. Built to meet international safety and quality norms, it integrates with centralized fleet management and energy systems, offering clear total cost of ownership advantages for global networks.

180KW DC Fast Charging Station Guarantees Peak Performance Outperforms the Competition

Metric Specification Value
Model DC Fast Charger 180 kW max
Power Rating Peak Output 180 kW
Voltage Range DC: 200–920 V -
Max Output Current Up to 550 A -
Connectors 2x CCS2, 1x CHAdeMO -
Efficiency Rated efficiency 96.5%
Power Factor PF >0.95
Operating Temperature -30°C to 50°C -
Cooling Liquid-cooled -
Ingress Protection IP65 -
Protocols OCPP 1.6/2.0, IEC 61851, ISO 15118 -
Connectivity Ethernet, LTE/5G, Wi-Fi -
OTA Updates Supported Yes
MTBF 25,000 hours -
Annual Uptime 99.2% -
Ports per Station 3 DC ports (2x CCS2, 1x CHAdeMO) -
Annual Energy Delivered Estimate based on uptime ≈ 1,600,000 kWh
Notes Outdoor-ready, scalable for single or multi-stall deployments -

Related Products

Factory Direct Supply EVSE

180KW DC Fast Charging Station Ahead of the Curve Manufacturers You Can Rely On

Data Dimension: Regional Deployment of 180kW DC Fast Chargers (Hypothetical)

This chart presents a hypothetical snapshot of regional deployment for high-power 180kW DC fast charging stations. The data dimension shown on the horizontal axis is Region, and the vertical axis indicates the number of installed stations. Values are illustrative and do not reflect any specific company’s network. The intent is to explore how deployment scales across different markets and what factors influence where investments concentrate.

Asia-Pacific shows the highest count here, reflecting rapid EV adoption, urban density, and strong government incentives in many large economies. North America and Europe show substantial networks but lag Asia-Pacific somewhat, consistent with mature but slower-growing markets. Latin America and Africa & Middle East display more modest levels, highlighting longer build-out horizons, regulatory variability, and capital constraints. The distribution underscores important considerations for planners: infrastructure must align with expected demand, grid capacity, and charger utilization. In high-demand regions, the value of deploying additional 180kW stations includes reduced user wait times for high-energy vehicles and the ability to support fleet operations, logistics, and long-distance travel.

Limitations: This dataset is synthetic and simplified. It aggregates installations into a single count per region, ignoring port counts per station, service uptime, and interconnection constraints. The metric does not reflect utilization, which can diverge significantly from installed capacity. Real-world analyses would incorporate time-series data, growth trajectories, policy shocks, electricity pricing, and charging behavior, including station clustering in major corridors and urban centers. Nevertheless, the visualization demonstrates how a single dimension (Region) and a single measure (Number of Stations) can provide quick insights into relative market maturity. It serves as a starting point for more granular analyses, informing investment decisions, policy discussions, and infrastructure planning aimed at accelerating transition to zero-emission mobility.

Top Selling Products